County Correspondence
- A memo to the EPA about the Smurfit-Stone site groundwater investigation (2016)
- A letter to the EPA about the sludge impoundments and landfills at the Smurfit-Stone site (2016)
- Letter to the EPA from the Water Quality District requesting better outreach, public engagement and communication by the EPA about Smurfit-Stone (2016)
- Letter to the EPA from the Missoula County commissioners requesting better outreach, public engagement and communication by the EPA about Smurfit-Stone (2016)
- A letter to the EPA regarding investigation into the polychlorinated biphenyls (PCB) contamination at the site (2017)
- A letter to comment on the EPA’s groundwater monitoring plan (2017)
- A letter to comment on the remedial investigation workplan for the removal of PCB-impacted soils (2017)
- A letter to comment on the remedial investigation workplan for the geotechnical stability evaluation of the Clark Fork River berm (2017)
- A letter to comment on the soil samplings (2017)
- A letter to request the EPA do additional sampling of Smurfit-Stone site, which EPA agrees to (2022)