Development Projects
Let us know your thoughts on private development projects happening in Missoula County.
Missoula County routinely considers development projects such as subdivisions, family transfers, boundary line relocations and rezoning requests. The projects featured on this page first come to the Planning, Development and Sustainability Department to ensure they meet various requirements related to zoning, land use, floodplain and other regulations. The Board of County Commissioners then considers approval of projects at their public meetings.
Comments on these projects help planning staff more accurately present to the commissioners how the community feels about the proposals, so the commissioners can make well-informed decisions on each project.
Let us know your thoughts on private development projects happening in Missoula County.
Missoula County routinely considers development projects such as subdivisions, family transfers, boundary line relocations and rezoning requests. The projects featured on this page first come to the Planning, Development and Sustainability Department to ensure they meet various requirements related to zoning, land use, floodplain and other regulations. The Board of County Commissioners then considers approval of projects at their public meetings.
Comments on these projects help planning staff more accurately present to the commissioners how the community feels about the proposals, so the commissioners can make well-informed decisions on each project.
-
Sign Variance - 7985 Hwy. 200 E
Share Sign Variance - 7985 Hwy. 200 E on Facebook Share Sign Variance - 7985 Hwy. 200 E on Twitter Share Sign Variance - 7985 Hwy. 200 E on Linkedin Email Sign Variance - 7985 Hwy. 200 E linkThe Missoula County Consolidated Land Use Board (MCCLUB) held a public hearing for this request on March 4, 2026. During the public hearing, the applicants provided an amended sign plan that altered the design of the proposed wall signs and reduced the overall sign face area to 236.66 square feet. The amended sign plans are attached in the Important Links and Documents section of this page. At the March 4, 2026, meeting, the MCCLUB voted to approve the request for a variance from Section 8.8.O.1 Table 17, for the amended sign plans as presented at the meeting. The second variance request from Section 8.7.B Table 2, will be considered at the next MCCLUB meeting on April 1, 2026.
Missoula County Consolidated Land Use Board Meeting: Wednesday, April 1, 6 p.m.
· In-person location: 200 W. Broadway, Missoula County Courthouse, Sophie Moiese Room
· Virtual option: Residents can attend the meeting via Microsoft Teams. To join the meeting on your device, follow the links on the agenda that will be published on the Consolidated Land Use Board page.
Project Description:
Bonner 1 RE LLC is requesting a sign variance for their property at Bonner Town Pump Travel Plaza, located at 7985 Hwy. 200 E in Bonner.
The variance request is to accommodate the following changes:
- A variance to switch out five of the nine existing legal nonconforming signs. Current zoning regulations only permit four signs per project site.
- A variance to expand the total sign face area of the five new signs allowed in the CC zoning district. The five existing wall signs have a combined sign face area of 247 square feet, and the five proposed wall signs would have a combined sign face area of 317.83 square feet.

Project Background:
The existing nine signs on this property are currently legal nonconforming and were approved prior to current zoning regulations for this area. Legal nonconforming means that the signs are allowed to exist even though it does not conform with current regulations, with the understanding that any changes beyond normal maintenance and upkeep would require a variance from the Missoula County Consolidated Land Use Board.
Missoula County Sign Regulations:
What is a variance?
A variance is a relaxation of specific provisions of zoning regulations that can be granted if certain criteria can be met. The Consolidated Land Use Board may only approve a zoning variance if it’s not contrary to the public interest and does not give an advantage to a particular business that is not also enjoyed by other businesses in the same zoning district. They must evaluate proposed variances using the following criteria and find favorably that:
- The variance will not authorize a use that is not already allowed in the zoning district.
- The variance will not authorize additional density beyond what is allowed in the zoning district.
- Special conditions exist that are unique to the property, such as size, shape, topography or location, that do not apply to other lands in the same zoning classification.
- Literal enforcement of the provisions of the regulations will result in unnecessary hardship that is not of the applicant’s own making.
- Granting the variance will be in harmony with the general purpose and intent of these regulations and the Missoula County Growth Policy and will not be injurious to the neighborhood or otherwise detrimental to the public welfare.
- The request for the variance is not based on monetary factors.
Project Timeline:
Missoula County Consolidated Land Use Board Meeting: Wednesday, March 4, 6 p.m.
- In-person location: 200 W. Broadway, Missoula County Courthouse, Sophie Moiese Room
- Virtual option: Residents can attend the meeting via Microsoft Teams. To join the meeting on your device, follow the links on the agenda that will be published on the Consolidated Land Use Board page.
Missoula County Consolidated Land Use Board Meeting: Wednesday, April 1, 6 p.m.
· In-person location: 200 W. Broadway, Missoula County Courthouse, Sophie Moiese Room
· Virtual option: Residents can attend the meeting via Microsoft Teams. To join the meeting on your device, follow the links on the agenda that will be published on the Consolidated Land Use Board page.
Public Comment:
Submit public comment by Tuesday, March 3, by using the comment tool below.
Project Lead:
Patrick Swart, 406-258-4841
Important Links and Documents:
Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends
No thanks -
Granite Peak RV Resort Phasing Plan Extension
Share Granite Peak RV Resort Phasing Plan Extension on Facebook Share Granite Peak RV Resort Phasing Plan Extension on Twitter Share Granite Peak RV Resort Phasing Plan Extension on Linkedin Email Granite Peak RV Resort Phasing Plan Extension linkThe public hearing meeting for this project has been changed to Thursday, April 2.
Project Description:
Granite Peak RV Resort, located at 9900 Thoroughbred Lane Missoula, is requesting an extension of the Phase 1 preliminary plat approval from August 2026 to August 2029 due to ongoing engineering work and pending agency approvals. This request does not affect the Phase 2 deadline. In 2024, the commissioners approved 50-space expansion of the existing RV park and received Special Exception approval after the property was rezoned to Neighborhood Residential. Construction for this project cannot begin until utility and infrastructure approvals are finalized.

Missoula County Subdivision Regulations Extension
Missoula County Subdivision Regulations (MCSR) Section 5.8.18.4 allows extension of at least one but no more than three years from the date of the request, which applies to the entire subdivision. Final plats for all phases of a subdivision approved on or after May 8, 2017, must be submitted to review and approved, conditionally approved or denied within 20 years of the date or preliminary plat approval (MCSR 5.8.19.5 B).
Project Timeline:
County commissioners’ public hearing: 2 p.m., Thursday, April 2
- In-person location: Sophie Moiese Room, Missoula County Courthouse Annex, 200 West Broadway, Missoula
- Virtual option: Residents can attend the meeting via Microsoft Teams. To join the call on your phone, call 406-272-4824, Conference ID 467 457 758#. To join the meeting on your device, follow the links on the agenda that will be published at http://missoula.co/bccmeetings
Public Comment:
Submit public comment by Wednesday, April 1, by using the comment tool below.
Project Lead:
Katy Reeder, kreeder@missoulacounty.us
Important Links and Documents:
Granite Peak Phasing Extension Application
Missoula County Subdivision Regulations
Former project: Granite Peak RV Park Extension in the Wye Application
Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends
No thanks -
County 310 Permit No. 26-01
Share County 310 Permit No. 26-01 on Facebook Share County 310 Permit No. 26-01 on Twitter Share County 310 Permit No. 26-01 on Linkedin Email County 310 Permit No. 26-01 linkProject Description:
The Missoula County Planning, Development and Sustainability Department (PDS) has received a 310 Permit application from Clayton Moore to replace a deck and stairs for an existing structure and remove five trees next to Rattlesnake Creek. The site is located at 700 E Broadway next to the Rattlesnake Creek: Lots 6-10, Block 18, McWhirk Addition, S22, T13N, R19W in Missoula City limits.

What is a 310 permit?
A 310 permit is required for any projects that change natural flowing streams and rivers within Missoula City limits undertaken by a non-governmental body. This includes any work to the Clark Fork River and Rattlesnake Creek within city limits. Unlike a floodplain permit, 310 permits are overseen by county commissioners and not the floodplain administrator.
Click here for information about county 310 permitting.
Project Timeline:
County commissioners’ hearing: 2 p.m. Thursday, April 9
- In-person location: Sophie Moiese Room, Missoula County Courthouse Annex, 200 West Broadway, Missoula
- Virtual option: Residents can attend the meeting via Microsoft Teams. To join the call on your phone, call 406-272-4824, Conference ID 467 457 758#. To join the meeting on your device, follow the links on the agenda that will be published at http://missoula.co/bccmeetings
Public Comment:
Submit public comment by 5 p.m., Wednesday, April 8, through the following three ways.
- Use the comment tool below. You must be registered on Missoula County Voice
- Email floodplain@missoulacounty.us
- Mail to Planning, Development and Sustainability
- Attn: Matt Heimel, Floodplain Administrator, 200 W. Broadway St., Missoula, MT 59802
Questions or want to make an appointment?
Please feel free to call 406-258-4647 or email floodplain@missoulacounty.us with any questions or to make an appointment to review the permit application.
Important Documents and Links:
310 Permit Information Webpage
Physical applications are available in the PDS office at 127 E. Main St., Suite 2 in downtown Missoula
Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends
No thanks -
Larch Meadows Minor Subdivision (Huson)
Share Larch Meadows Minor Subdivision (Huson) on Facebook Share Larch Meadows Minor Subdivision (Huson) on Twitter Share Larch Meadows Minor Subdivision (Huson) on Linkedin Email Larch Meadows Minor Subdivision (Huson) linkProject Description:
This is a request from Mountain Construction, Inc, represented by 406 Engineering, to subdivide a 12.31-acre parcel into three residential lots located at 31725 Ranch Lane in Huson. The proposed lots are roughly four acres each, with each lot intended for a single-family residence.

As part of this development, there will be new driveways along the existing roads to access each of the lots. There will be no changes to the existing road system and there are no proposed roads or non-motorized facilities as part of the development’s proposal.
The property is currently in an unzoned area of Missoula County. The Land Use Designation map from Missoula County Growth Policy recommends Open and Resource land designation for this property and for most of Ninemile Valley, however, similar developments like this are scattered across the valley. Water for this subdivision will be provided by individual wells. Well logs show a yield of 20 gallons per minute, approximately 35 feet below the ground surface. Sewer will be provided by individual drain fields on each lot. These will be designed and constructed per Montana Department of Environmental Quality Circular -4 and Missoula County Regulations. Stormwater will be retained by landscaping and retention ponds located on site.
Subdivision Regulations
Missoula County’s subdivision regulations promote public health, safety and general welfare by ensuring any subdivision of land in the County’s jurisdiction provides for adequate light, air, water supply, sewage disposal, parks and recreation areas, ingress and egress and other public requirements. A subdivision is considered “minor” when it has five or fewer lots.
Staff consider the following when making a recommendation to the county commissioners on whether to approve or deny a subdivision request:
- compliance with zoning and the Growth Policy
- effects on agriculture and agricultural water user facilities, local services, the natural environment, wildlife, and wildlife habitat and public health and safety
- compliance with survey requirements established in state statute, and local subdivision regulations and review procedures
- provision of necessary easements and other legal and physical access
Project Timeline:
County commissioners’ public hearing meeting: 2 p.m. Thursday, April 9
- In-person location: 200 W. Broadway, Missoula County Courthouse, Sophie Moiese Room
- Virtual option: Residents can attend the meeting via Microsoft Teams. To join the meeting on your device, follow the links on the agenda that will be published on the Missoula County’s public meeting portal.
Public Comment:
Submit public comment by Wednesday, April 8, using the comment tool below.
Project Lead:
Katy Reeder, 406-258-3707
Important Links and Documents:
Larch Meadows Minor Subdivision Application
Planning, Development and Sustainability
Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends
No thanks -
Ranch Club Subdivision Phasing Plan Extension
Share Ranch Club Subdivision Phasing Plan Extension on Facebook Share Ranch Club Subdivision Phasing Plan Extension on Twitter Share Ranch Club Subdivision Phasing Plan Extension on Linkedin Email Ranch Club Subdivision Phasing Plan Extension linkThe Ranch Club Subdivision phasing plan extension was granted a continuance until the May 28 public hearing meeting, at which point commissioners will make a motion to approve or deny the request. Residents are welcome to attend the May 28 public hearing meeting.
Missoula County Consolidated Land Use Board Meeting: Thursday, May 28, 2 p.m.
· In-person location: 200 W. Broadway, Missoula County Courthouse, Sophie Moiese Room
· Virtual option: Residents can attend the meeting via Microsoft Teams. To join the meeting on your device, follow the links on the agenda that will be published on the Consolidated Land Use Board page.
Project Description:
Ranch Club Investments LLC, represented by Genesis Engineering Inc., is requesting a Phasing Plan Extension of the Ranch Club Subdivision Phases 10 and 11. This subdivision was originally approved in 2003, as a phased subdivision with 323 lots, formerly known as Phantom Hills Estates.
The applicant requests the following:
- 2-year extension of the Phase 10 filing deadline to Dec. 31, 2027
- 3-year extension of the Phase 11 filing deadline to Dec. 31, 2029
These are the two remaining phases of the Ranch Club development and will consist of 52 single-family lots, 41 townhome lots and 5.55 acres of dedicated parkland.

Missoula County Subdivision Regulations Phasing Plan Extension
Missoula County Subdivision Regulations (MCSR) Section 5.8.18.4 allows extension of at least one but no more than three years from the date of the request, which applies to the entire subdivision. Final plats for all phases of a subdivision approved on or after May 8, 2017, must be submitted to review and approved, conditionally approved or denied within 20 years of the date or preliminary plat approval (MCSR) Section 5.8.18.5.B.
Project Timeline:
County commissioners’ public hearing meeting: 2 p.m. Thursday, March 26
- In-person location: 200 W. Broadway, Missoula County Courthouse, Sophie Moiese Room
- Virtual option: Residents can attend the meeting via Microsoft Teams. To join the meeting on your device, follow the links on the agenda that will be published on the Missoula County’s public meeting portal.
Public Comment:
Submit public comment by Wednesday, March 25, using the comment tool below.
Project Lead:
Kevin Dantic, 406-258-4652
Important Links and Documents:
Ranch Club Phasing Plat Extension
Planning, Development and Sustainability
Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends
No thanks -
Floodplain Development No. 26-12
Share Floodplain Development No. 26-12 on Facebook Share Floodplain Development No. 26-12 on Twitter Share Floodplain Development No. 26-12 on Linkedin Email Floodplain Development No. 26-12 linkProject Description
The Missoula County Planning, Development and Sustainability Department (PDS) has received a Floodplain Development Permit #26-12 from Grant Creek Crossing – Missoula LLC for reconstruction of Schramm Street in the Grant Creek regulated flood hazard area.
The site is located at the Schramm Street crossing over Grant Creek, about 725 feet of Reserve Street: Tract 3A-1B COS 7031, S05, T13N, R19W in Missoula County.

What is a floodplain development permit?
The primary purpose of a floodplain development permit is to promote public health, safety and general welfare, to minimize flood losses in areas subject to flood hazards, and to promote wise use of the floodplain.
Public Comment
Submit public comment by 5 p.m., Monday, April 6, through the following three ways.
- Use the comment tool below. You must be registered on Missoula County Voice
- Email floodplain@missoulacounty.us
- Mail to Planning, Development and Sustainability
- Attn: Matt Heimel, Floodplain Administrator, 200 W. Broadway St., Missoula, MT 59802
Questions or want to make an appointment?
Please feel free to call 406-258-4647 or email floodplain@missoulacounty.us with any questions or to make an appointment to review the permit application.
Important Documents and Links
Floodplain and Shoreline Administration Webpage
Physical applications are available in the PDS office at 127 E. Main St., Suite 2, in downtown Missoula
This permit is subject to approval by the floodplain administrator and does not go before the county commissioners.
Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends
No thanks -
Floodplain Development No. 26-08 (Seeley Lake)
Share Floodplain Development No. 26-08 (Seeley Lake) on Facebook Share Floodplain Development No. 26-08 (Seeley Lake) on Twitter Share Floodplain Development No. 26-08 (Seeley Lake) on Linkedin Email Floodplain Development No. 26-08 (Seeley Lake) linkProject Description
The Missoula County Planning, Development and Sustainability Department (PDS) has received a Floodplain Development Permit Application #26-08 from Amee Tafoya for reconstruction of a cabin in the Clearwater River regulated flood hazard area.
The site is located at 975 Leaning Pine Drive on state-leased land: Parcel: 13, COS 4875, S)4, T16N, R15W in Missoula County.

What is a floodplain permit?
The primary purpose of a Floodplain Development Permit is to promote public health, safety, and general welfare, to minimize flood losses in areas subject to flood hazards, and to promote wise use of the floodplain.
Public Comment
Submit public comment by 5 p.m., Monday, April 6, through the following three ways.
- Use the comment tool below. You must be registered on Missoula County Voice
- Email floodplain@missoulacounty.us
- Mail to Planning, Development and Sustainability
- Attn: Matt Heimel, Floodplain Administrator, 200 W. Broadway St., Missoula, MT 59802
Questions or want to make an appointment?
Please feel free to call 406-258-4647 or email floodplain@missoulacounty.us with any questions or to make an appointment to review the permit application.
Important Documents and Links
Floodplain Permit Application and Value Estimates – 8.28.25
Floodplain Permit Application and Values Estimates – 9.18.25
Floodplain and Shoreline Administration Webpage
Physical applications are available in the PDS office at 127 E. Main St., Suite 2 in downtown Missoula
This permit is subject to approval by the floodplain administrator and does not go before the county commissioners.
Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends
No thanks -
Floodplain Development No. 26-05 (Frenchtown)
Share Floodplain Development No. 26-05 (Frenchtown) on Facebook Share Floodplain Development No. 26-05 (Frenchtown) on Twitter Share Floodplain Development No. 26-05 (Frenchtown) on Linkedin Email Floodplain Development No. 26-05 (Frenchtown) linkProject Description
The Missoula County Planning, Development & Sustainability Department (PDS) has received a Floodplain Development Permit Application #26-05 from George Neumunz for construction of a stream crossing in the Sixmile Creek regulated flood hazard area.
The site is located on the west side of the Sixmile Road: Lot 21 of Six Mile Timber Tracts #2, S23, T15N, R22W, Missoula County.

What is a floodplain development permit?
The primary purpose of the floodplain development permit is to promote the public health, safety, and general welfare, to minimize flood losses in areas subject to flood hazards, and to promote wise use of the floodplain.
Public Comment:
Submit public comment by 5 p.m., Monday, April 6 through the following three ways.
- Use the comment tool below. You must be registered on Missoula County Voice
- Email floodplain@missoulacounty.us
- Mail to Planning, Development, & Sustainability
- Attn: Matt Heimel, Floodplain Administrator, 200 W. Broadway St., Missoula, MT 59802
Questions or want to make an appointment?
Please feel free to call 406-258-4647 or email floodplain@missoulacounty.us with any questions or to make an appointment to review the permit application.
Important Documents and Links:
Supplemental and Revised Packet
Floodplain and Shoreline Administration Webpage
Physical applications are available in the PDS office at 127 E. Main St., Suite 2 in downtown Missoula
This permit is subject to approval by the floodplain administrator and does not go before the county commissioners.
Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends
No thanks -
Floodplain Development No. 26-03
Share Floodplain Development No. 26-03 on Facebook Share Floodplain Development No. 26-03 on Twitter Share Floodplain Development No. 26-03 on Linkedin Email Floodplain Development No. 26-03 linkProject Description
The Missoula County Planning, Development, & Sustainability Department (PDS) has received Floodplain Development Permit Application #26-03 from Gregory Axtman for electrical utility work.
The primary purpose of a Floodplain Development Permit is to promote the public health, safety, and general welfare, to minimize flood losses in areas subject to flood hazards, and to promote wise use of the floodplain.
Project Location
The site is located at 1744 Snowmass Drive in the Clearwater River regulated flood hazard area: Parcel 15 of COS 5140, Section 04, Township 16 North, Range 15 West, Missoula County. See location here.
The full application is available for review online or in the PDS office at 127 E. Main St., Suite 2, in Missoula.
Please feel free to call 406-258-4657 or email floodplain@missoulacounty.us with any questions or to make an appointment to review the permit application.
Public Comment
Submit comments by 5 p.m., Friday, Oct. 17, by using the comments tools below, by emailing floodplain@missoulacounty.us or mailing to Planning, Development, & Sustainability, Attn: Matt Heimel, Floodplain Administrator, 200 W. Broadway St., Missoula MT 59802.
Related Documents and Links
This permit is subject to approval by the floodplain administrator and does not go before the Board of County Commissioners.
Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends
No thanks -
Blackfoot Crossing Riverfront Project (Bonner, Milltown & West Riverside)
Share Blackfoot Crossing Riverfront Project (Bonner, Milltown & West Riverside) on Facebook Share Blackfoot Crossing Riverfront Project (Bonner, Milltown & West Riverside) on Twitter Share Blackfoot Crossing Riverfront Project (Bonner, Milltown & West Riverside) on Linkedin Email Blackfoot Crossing Riverfront Project (Bonner, Milltown & West Riverside) linkUpdate as of March 17
The county commissioners heard public comment at their March 5 and 12 meetings. After much discussion, the commissioners approved the growth policy amendment, rezoning, and Blackfoot Crossing Riverfront minor subdivision. These amendments will allow for residential, light industrial, and limited neighborhood commercial development, as well as recreational and open space uses along the Blackfoot River and the nearby mountain slopes.
The commissioners opted for Neighborhood Center zoning instead of the proposed commercial center zoning, so a travel plaza will not be an allowed use in the development. The new zoning does not take effect until the commissioners receive public comment for 30 days after a resolution of intent to adopt the zoning is published in the Missoulian (and the commissioners ultimately sign a final resolution to adopt). The timeframe for when the notice will be published is to be determined.
Map showing approved growth policy designation
What is a resolution of intent?
A resolution of intent does not mean a project is approved to go forward. A resolution of intent means there is intention to adopt the project, but certain conditions need to be met before the project is approved. It is not the same as a vote of approval.
What’s next?
Since the commissioners did not approve the zoning requested by the developer needed to build a travel plaza, the developer stated he will need to rework aspects of the project to make it feasible. If there are no paths forward, the developer can choose to table this project. This means the resolution of intent, which includes the approval of the growth policy amendment, and rezoning, will not go forward. The property would retain its current land use designation and zoning as largely heavy industrial. The developer may also decide to keep the original Blackfoot Crossing Subdivision or file the newly approved Blackfoot Crossing Riverfront Subdivision.
Project Background
Growth Policy Amendment and Rezoning: The developer of the Blackfoot Crossing Riverfront project seeks to amend Missoula County’s Growth Policy and zoning map by changing the land use designations and rezoning the former West Bonner Log Yard. If these requests are not approved, the proposed subdivision would not comply with current zoning regulations and could not be permitted as proposed. If approved, this project will convert the 107-acre site into a mix of new commercial, residential, industrial, recreational and open space uses.
The proposal is to amend the Missoula County Growth Policy Land Use Element Map as follows:
- Preliminarily approved Blackfoot Crossing Subdivision, Lots 23, 24, 25, 26 and 27: proposed to be designated Commercial Center; other land use designations that may be considered for adoption for these lots are Neighborhood Commercial and Industrial Center.
- Proposed Blackfoot Crossing Riverfront Subdivision, Lots 5, 6, 7 and 8: proposed to be designated as Neighborhood Center.
- Proposed Blackfoot Crossing Riverfront Subdivision Common Areas, CA2 and CA4: proposed to be designated as Open Land, Resource, and Recreation.
- Proposed Blackfoot Crossing Riverfront Subdivision Common Area CA5: proposed to be designated as Working Lands.

While this property is currently vacant, the County’s Growth Policy has designated most of it for heavy industrial use. With the growth policy amendment and rezoning, the developer proposes to reduce the area zoned heavy industrial to accommodate a new mixed-use development, including housing and commercial uses. Currently, 68 acres of this site are zoned Industrial Center Heavy (ICH), 17 acres are zoned Industrial Center Light (ICL), and 22 acres are zoned Agriculture, Working (AGW40). Under this proposal, the developer seeks to amend the zoning map as follows:
- Establish Commercial Center zoning on the west side of the property near the junction of Highway 200 and 1st Street. Preliminarily approved Blackfoot Crossing Subdivision, Lots 23, 24, 25, 26, and 27 are proposed to be zoned Commercial Center (CC); other zoning districts that may be considered for adoption for these lots are Neighborhood Commercial (NC) and Industrial Center Light (ICL). The developer has indicated that a travel plaza is intended for this area, and rezoning to Commercial Center (CC) would permit other retail, service, food and beverage, motel and office uses.
- Establish Neighborhood Center zoning that allows a broad range of housing, retail and office use. Proposed Blackfoot Crossing Riverfront Subdivision, Lots 5, 6, 7 and 8 are proposed to be zoned as Neighborhood Center (NC). This zone would establish a minimum density of eight units per acre and limit maximum building footprint and height. The developer's proposed housing development includes smaller, neighborhood-scale options: single-family homes on small lots, duplexes, triplexes, quadplexes, townhomes, and potentially larger units with six to eight homes.
- Rezone Common areas CA2 and CA4 as Resource and Open Lands (RO). These areas are intended to provide utility easements and increase access to nearby public lands.
The northeastern corner of the property (CA5) would remain unchanged, with a zoning designation of Agricultural Working Lands (AGW-40).
A full list of permitted uses by zone is available in Section 2.4, Chapter 2 of the County Zoning Regulations.

Minor Subdivision: This proposal also includes a five-lot minor subdivision called Blackfoot Crossing Riverfront. The subdivision is proposed in four phases over the next eight years. Each phase must function on its own, meaning roads, sidewalks, water, sewer, fire protection and stormwater systems are built as the project grows—not left for later.
Much of the land along the Blackfoot River is proposed to remain undeveloped as common area open space. Easements for a future public, non-motorized trail in the common area next to the river connect Milltown State Park, nearby neighborhoods and nearby public lands.
New roads would connect to Cowboy Trail and West Riverside Drive, with sidewalks on both sides and a bike- and pedestrian-friendly design. Traffic studies indicate that a future roundabout and intersection upgrades are planned when growth warrants them.
The site has been disturbed by past industrial use. Studies found no significant impacts on agriculture, limited wildlife habitat in developed areas, and no considerable groundwater or flood risks in the proposed building areas. Sensitive slopes and river-adjacent land are set aside as open space. Stormwater will be captured and infiltrated on-site, preventing runoff from flowing into the river.
The developer plans to create a new public water and sewer system to serve the new development and may also expand it to serve the surrounding area. The surrounding West Riverside community would not be required to connect to these systems; however, the systems will be designed to support future expansion into surrounding areas.
The proposed water supply wells must be permitted by the Montana Department of Environmental Quality (DEQ) as Public Water Supply sources. The wastewater treatment facility, a membrane bioreactor (MBR) system, has been submitted for DEQ permitting but has not yet been approved.
Additional information about the subdivision is provided in the links on the right side of this page.
Project Timeline:
Tuesday, Jan. 20, 6 p.m.: Missoula Consolidated Planning Board Meeting (Growth Policy Amendment and Rezoning)
- In-person location: 200 W. Broadway, Missoula County Courthouse, Sophie Moiese Room
- Virtual option: Residents can attend the meeting via Microsoft Teams. To join the meeting on your device, follow the links on the agenda that will be published on the Missoula County’s public meeting portal.
Thursday, March 5, 2 p.m.: County Commissioners’ Public Meeting (Growth Policy Amendment, Rezoning, and Minor Subdivision)
- In-person location: 200 W. Broadway, Missoula County Courthouse, Sophie Moiese Room
- Virtual option: Residents can attend the meeting via Microsoft Teams. To join the meeting on your device, follow the links on the agenda that will be published on the Missoula County’s public meeting portal.
Thursday, March 12, 2 p.m.: County Commissioners’ Public Meeting (Growth Policy Amendment, Rezoning, and Minor Subdivision)
- In-person location: 200 W. Broadway, Missoula County Courthouse, Sophie Moiese Room
-
Virtual option: Residents can attend the meeting via Microsoft Teams. To join the meeting on your device, follow the links on the agenda that will be published on the Missoula County’s public meeting portal.
Project Lead:
Kathleen Arthur, 406-258-3429
Ian Varley, 406-258-4653
Jennie Dixon, 406-258-4946
Important Links and Documents:
Growth Policy Amendment Request
Blackfoot Crossing Riverfront Public Notice
Blackfoot Crossing Riverfront Subdivision Application
Application for Governing Body Review
For more supporting documents, follow this link, and go to the Blackfoot Crossing Riverfront Project folder under Important Documents on the right-hand side.
Public Comment:
Submit public comment by using the comment tool below.
Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends
No thanks
Follow Project
Who's Listening
-
Phone 406-258-4794 -
Planner III/Floodplain Administrator
Missoula County Planning, Development and Sustainability
Phone 406-258-3799 -
Phone 406-258-4946 -
Phone 406-258-3425 -
Phone 406-258-3706 Email lryan@missoulacounty.us -
Phone 406-258-4841 -
Phone 406-258-4652 -
Phone 406-258-3707
Important Documents
-
Blackfoot Crossing Project
-
01_Growth Policy Amendment Request2.0.pdf (739 KB) (pdf)
-
02_Zoning Amendment Application.pdf (317 KB) (pdf)
-
03_Existing Land Use.pdf (518 KB) (pdf)
-
04_Proposed Land Use.pdf (532 KB) (pdf)
-
05_Working Lands Land Use.pdf (383 KB) (pdf)
-
06_Open Resource and Recreation Land Use.pdf (383 KB) (pdf)
-
07_Neighborhood Center Land Use.pdf (368 KB) (pdf)
-
08_Commercial Center Land Use.pdf (350 KB) (pdf)
-
09_Industrial Center Land Use.pdf (353 KB) (pdf)
-
10_Heavy Industrial Center Land Use.pdf (361 KB) (pdf)
-
11_Existing Zoning.pdf (550 KB) (pdf)
-
12_Proposed Zoning.pdf (551 KB) (pdf)
-
13_Zoning Uses.pdf (190 KB) (pdf)
-
14_Aerial Topo.pdf (1.35 MB) (pdf)
-
15_Existing Conditions.pdf (907 KB) (pdf)
-
16_01 Legal Constraints.pdf (684 KB) (pdf)
-
17_WUI.pdf (186 KB) (pdf)
-
18_Slopes.pdf (5.65 MB) (pdf)
-
19_High Pressure Gas Lines.pdf (456 KB) (pdf)
-
20_utilities.pdf (581 KB) (pdf)
-
21_Earthquake Faults.pdf (2.12 MB) (pdf)
-
22_avalanche slope.pdf (1.15 MB) (pdf)
-
23_Hazardous Waste.pdf (435 KB) (pdf)
-
24_Healthcare Facilities.pdf (695 KB) (pdf)
-
25_Dam Failure.pdf (343 KB) (pdf)
-
26_Vegetation.pdf (1.51 MB) (pdf)
-
27_Flooplain.pdf (1.3 MB) (pdf)
-
28_Hydrology.pdf (740 KB) (pdf)
-
29_Wildlife Distribution.pdf (1.77 MB) (pdf)
-
30_Transportation.pdf (1.92 MB) (pdf)
-
31_Cultural Resource Inventory.pdf (6.87 MB) (pdf)
-
32_Soils Report.pdf (1.26 MB) (pdf)
-
33_Blackfoot Crossing 1 Subdivision.pdf (4.17 MB) (pdf)
-
34_Blackfoot Crossing 1 Sub Phasing Plan.pdf (345 KB) (pdf)
-
35_Blackfoot Riverfront Pplat.pdf (2.39 MB) (pdf)
-
36_ Riverfront Phasing.pdf (359 KB) (pdf)
-
37_Preliminary Stormwater Report.pdf (8 MB) (pdf)
-
38_Test Pits.pdf (159 KB) (pdf)
-
39_Well Logs.pdf (1.39 MB) (pdf)
-
40_02_Neighborhood Meeting Letter_Mtg 1.pdf (111 KB) (pdf)
-
40_04_PowerPoint Presentation_Mtg 1.pdf (9.6 MB) (pdf)
-
40_06_Neighborhood Meeting Summary_Mtg 1.pdf (130 KB) (pdf)
-
40_07_Neighborhood Comment_Mtg 1.pdf (715 KB) (pdf)
-
41_02_Neighborhood Meeting Letter_Mtg 2.pdf (118 KB) (pdf)
-
41_04_PowerPoint Presentation_Mtg 2.pdf (4.79 MB) (pdf)
-
41_05_Neighborhood Meeting Summary_Mtg 2.pdf (1000 KB) (pdf)
-
42_01_September 9 2025 Community Council Agenda.pdf (665 KB) (pdf)
-
42_02 Community Council Meeting Summary.pdf (39.4 KB) (pdf)
-
42_03_ Community Council Meeting Transcript.pdf (217 KB) (pdf)
-
42_04_Community Council Meeting Presentation.pdf (4.66 MB) (pdf)
-
42_05_Community Council Draft Meeting Minutes.pdf (706 KB) (pdf)
-
43_2009 Community Visioning Map.pdf (475 KB) (pdf)
-
44_2009 BMCC Meeting record (NEW 10.25).pdf (468 KB) (pdf)
-
45_Traffic Impact Study.pdf (22.4 MB) (pdf)
-
46_Tech Memo West Riverside Access Impacts.pdf (1.05 MB) (pdf)
-
BFXR Sub Rpt_FINAL.pdf (1.72 MB) (pdf)
-
Approved rezone.pdf (549 KB) (pdf)
-
Approved growth policy designation.pdf (532 KB) (pdf)
-
-
Brown Family Transfer
-
0 Cover Letter.pdf (50.8 KB) (pdf)
-
1 2023 Family Transfer Exemption Application and Affidavit.2023.Fillable.Form.pdf (1.17 MB) (pdf)
-
1.2 Signed Family Transfer Division of Land Affidavit.pdf (1.32 MB) (pdf)
-
1.5 Signed Landowner Letter.pdf (497 KB) (pdf)
-
1.7 WarrantyDeed.pdf (35.2 KB) (pdf)
-
2 Dinsmore IOrchard Homes 4 Lots 29 30bk17pg54.pdf (172 KB) (pdf)
-
4 Maps.docx (3.82 MB) (docx)
-
4.1 ZD-13 Franklin to Fort.pdf (1010 KB) (pdf)
-
4.2 ZD-13 resolution 2007-088.pdf (155 KB) (pdf)
-
4.3 FIRMETTE_f340b8a5-3b5a-4f36-91b2-7f1b330784f0.pdf (734 KB) (pdf)
-
5 Ditch Cards 3114 3110.pdf (434 KB) (pdf)
-
6 Septic Permit 2016-247.pdf (6.45 MB) (pdf)
-
7 3816 Brown-EXISTING.pdf (161 KB) (pdf)
-
7 3816 Brown-PROPOSED.pdf (170 KB) (pdf)
-
2026-01-20 Brown FT 400.pdf (447 KB) (pdf)
-
-
Grass Valley Farms
-
Review Criteria for Subdivision Requests (182 KB) (PNG)
-
Lolo Ranch Exemption Application (899 KB) (pdf)
-
Lolo Ranch Tract Information (56.5 KB) (pdf)
-
Lolo Ranch Existing and Proposed Parcels (684 KB) (pdf)
-
Spanish Skies Variance Request Application (7.45 MB) (pdf)
-
Frenchtown Storage — Buildings for Lease or Rent
-
Blackfoot Crossing Subdivision Phasing Plan Amendment and Plat Adjustment Application (13.2 MB) (pdf)
-
Floodplain Development Permit #25-12
-
Floodplain Development Permit #25-07
-
Floodplain Development Permit #25-15
-
Floodplain Development Permit #25-22
-
2025-05-12.SpecialExceptionVariance Application.pdf (29.9 MB) (pdf)
-
Lazy Acres Preliminary Plat Extension Request.pdf (314 KB) (pdf)
-
Floodplain Development #26-07
-
Floodplain Development #26-01
-
Floodplain Development #26-03
-
Floodplain Development #26-04
-
Floodplain Development #26-06
-
McAlister Family Transfer and Aggregation Exemption
-
Hertz Family Transfer Application
-
Floodplain Development #26-02
-
Floodplain Development 26-09.pdf (16.5 MB) (pdf)
-
Big Bear Addition Subdivision Amendment Proposal.pdf (1.51 MB) (pdf)
-
505 Highton Complete Application.pdf (2.43 MB) (pdf)
-
Schuff Family Transfer Application.pdf (6.81 MB) (pdf)
-
Stephenson Family Transfer Application
-
3614 Hwy 200 Special Exception Application
-
3507 S 7th St. W Special Exception
-
Floodplain Development #26-10
-
Ployhar Family Transfer.pdf (2.38 MB) (pdf)
-
Gilman Creek Road
-
Blackfoot Crossing Riverfront Public Notice.pdf (54.2 KB) (pdf)
-
Ram Addition- Minor Adjustment Application.pdf (4.06 MB) (pdf)
-
Hoyer Family Transfer Application.pdf (5.7 MB) (pdf)
-
Nordberg Family Transfer.pdf (5.41 MB) (pdf)
-
O'Keefe Ranch Estates Subdivision Landscaping Condition Amendment
-
Crawford Family Transfer Exemption Application.pdf (4.85 MB) (pdf)
-
Crawford Family Transfer Existing and Proposed Conditions.pdf (1.5 MB) (pdf)
-
Special Exception at 1815 Clements Rd. (Target Range)
-
2026-01-22 Granite Peak Phasing Ext App.pdf (1.49 MB) (pdf)
-
Ranch Club Subdivision Phasing Plan Extension
-
Larch Meadows Minor Subdivision
-
2026-03-06 Full Application.Missoula County.Larch Meadows (1).pdf (74.5 MB) (pdf)
-
Section A.pdf (836 KB) (pdf)
-
Section B.pdf (892 KB) (pdf)
-
Section C.pdf (1.51 MB) (pdf)
-
Section D.pdf (1.92 MB) (pdf)
-
Section E.pdf (22.7 MB) (pdf)
-
Section F.pdf (29.7 MB) (pdf)
-
Section G.pdf (15.5 MB) (pdf)
-
Section H.pdf (1.56 MB) (pdf)
-
Section I.pdf (1.91 MB) (pdf)
-
-
7985 Hwy. 200 E
-
County 310 Permit No. 26-01
-
Floodplain Development #26-05
-
Floodplain Development #26-08
-
Floodplain Development #26-12
-
Fire Bucket Meadows
-
Fire Bucket Meadows Application (73 MB) (pdf)
-
Fire Bucket Meadows Final Combined Groundwater Report (25.2 MB) (pdf)
-
Applicant Letter to COmmissioners 5-28-25.pdf (19 MB) (pdf)
-
Fire Bucket Loop Aquifer Test Work Plan.pdf (105 KB) (pdf)
-
Fire Bucket Meadows Subdivision Application.pdf (73 MB) (pdf)
-
Geosyntec Hydrologic Technical Analysis and Pump Test Results 1-22-26.pdf (7.88 MB) (pdf)
-
Photos of area homes (1).pdf (18.9 MB) (pdf)
-
Attachment D - Newman Hydrogeologist Report 5-22-26.pdf (153 KB) (pdf)
-
Pump Test Notice to Neighbors 10-13-25.pdf (315 KB) (pdf)
-
Sparks Well Log 9-17-25.pdf (830 KB) (pdf)
-
Water Quality Reports 11-25.pdf (1.19 MB) (pdf)
-
Water Rights Inc Letter 5-13.pdf (534 KB) (pdf)
-
Water Rights Inc. Review of Hydrogeologic Literature 5-5-25.pdf (25.2 MB) (pdf)
-
Willowstick Groundwater Well Siting Study 6-30-25.pdf (2.55 MB) (pdf)
-
Fire Bucket Meadows Form 633_2026.03.09.xlsx (738 KB) (xlsx)
-
Fire Bucket Layout 3-9-26.pdf (1000 KB) (pdf)
-
Water Quality District Comments 5-29-25.pdf (260 KB) (pdf)
-
Attachment O - Water Quality District Comments 5-12-25.pdf (205 KB) (pdf)
-
Attachment P - Water Quality District Comments 5-29-25.pdf (260 KB) (pdf)
-
Attachment Q - Water Quality District Presentation 5-29-25.pdf (31.2 MB) (pdf)
-
Attachment R - MPH Comments 5-22-25.pdf (3.91 MB) (pdf)
-
Attachment S - Amended Fire Bucket Prelim Plat 3-11-26.pdf (3.46 MB) (pdf)
-
Attachment T - Amended Fire Bucket Layout 3-11-26.pdf (930 KB) (pdf)
-
Attachment U - Final Amended Grading and Drainage Report 3-16-26.pdf (3.05 MB) (pdf)
-
Attachment V - Final Amended Preliminary Plat and Lot Layout 3-16-26.pdf (2.15 MB) (pdf)
-
News Categories
- Administrative Minor Subdivision (1)
- Amendments (3)
- Boundary Line Relocation (2)
- Buildings for Lease or Rent (1)
- Floodplain Permits (6)
- Industrial Subdivision (2)
- Major Subdivision (5)
- Minor Subdivision (26)
- Mullan Road (1)
- Phasing Plan Extension (1)
- Ranch Club Subdivision (1)
- Special Exception Applications (10)
- Special Exemption Applications (1)
- Use Variance Requests (16)
- Zoning and Rezoning (4)