Development Projects
Let us know your thoughts on private development projects happening in Missoula County.
Missoula County routinely considers development projects such as subdivisions, family transfers, boundary line relocations and rezoning requests. The projects featured on this page first come to the Planning, Development and Sustainability Department to ensure they meet various requirements related to zoning, land use, floodplain and other regulations. The Board of County Commissioners then considers approval of projects at their public meetings.
Comments on these projects help planning staff more accurately present to the commissioners how the community feels about the proposals, so the commissioners can make well-informed decisions on each project.
Let us know your thoughts on private development projects happening in Missoula County.
Missoula County routinely considers development projects such as subdivisions, family transfers, boundary line relocations and rezoning requests. The projects featured on this page first come to the Planning, Development and Sustainability Department to ensure they meet various requirements related to zoning, land use, floodplain and other regulations. The Board of County Commissioners then considers approval of projects at their public meetings.
Comments on these projects help planning staff more accurately present to the commissioners how the community feels about the proposals, so the commissioners can make well-informed decisions on each project.
-
875 Hidden Treasure Court Minor Subdivision
Share 875 Hidden Treasure Court Minor Subdivision on Facebook Share 875 Hidden Treasure Court Minor Subdivision on Twitter Share 875 Hidden Treasure Court Minor Subdivision on Linkedin Email 875 Hidden Treasure Court Minor Subdivision linkThe Missoula County Commissioners approved this subdivision at their public meeting on Thursday, June 12.
Project Description:
The 875 Hidden Treasure Court Minor Subdivision is a proposal to divide a 16.07-acre property located at 875 Hidden Treasure Ct. in Bonner, MT into two separate parcels. The property, currently known as Tract 27 of Certificate of Survey 219, is owned by Charley France and represented by Woith Engineering. View the map here.
The property currently has one single-family residence. The proposal includes constructing a second single-family home and a detached shop on the new lot. Two existing wells will provide water for both domestic use and irrigation. The existing home is served by a permitted septic system, and a new septic system is proposed for the second home.
Legal and physical access to the subdivision is provided by two private roads — Hidden Treasure Court and Camas Road — which connect to the public Hole in the Wall Road, located approximately 0.7 miles away. As part of the application, the developers are also requesting that the Board of County Commissioners consider establishing utility easements within county-owned road parcels to provide utility access from the public right-of-way.
Missoula County is seeking public comment on how the proposal meets subdivision review criteria, including:
Compliance with zoning and the Missoula County Growth Policy
Impacts on agriculture, local services, the environment, wildlife, and public health and safety
Conformance with survey and subdivision regulations
Access and infrastructure adequacy
Provision of easements
Project Timeline:
Public Comment Period: Now open through Sunday, May 19
Commissioners Public Meeting: Thursday, May 22, 2025, at 2 p.m.
Sophie Moiese Room — Missoula County Courthouse
Hybrid option available by joining the meeting via Microsoft Teams.
Community members and neighboring property owners are encouraged to submit comments prior to the public meeting. Comments may be submitted by commenting here or contacting the project lead.
Project Lead:
Patrick Swart
Planner, Missoula County Planning, Development and Sustainability(contact info to the right, under ‘Who’s Listening’)
Related Links & Documents:
-
Grovenstein Minor Subdivision
Share Grovenstein Minor Subdivision on Facebook Share Grovenstein Minor Subdivision on Twitter Share Grovenstein Minor Subdivision on Linkedin Email Grovenstein Minor Subdivision linkThe commissioners approved this subdivision proposal at a public hearing on Thursday, May 22.Project Description:
Missoula County is reviewing a proposed minor subdivision application known as the Grovenstein Minor Subdivision, located at 16520 Scheffer Lane in the Frenchtown area (legal description: SW ¼ of Section 30, Township 15 North, Range 21 West, P.M.M., Missoula County).
The developers have proposed a four-lot subdivision of an approximately 3.84-acre parcel. The proposed subdivision will create four lots:
Lot 17A (0.6 acres) – proposed commercial use, served by a new well and individual drainfield with access from Scheffer Lane.
Lot 17B (1.1 acres) – existing single-family residence, served by an existing drainfield and a shared well located on Lot 17C.
Lot 17C (0.9 acres) – proposed single-family residence, served by an individual drainfield and a shared well; access via easement across Lot 17D.
Lot 17D (1.2 acres) – proposed multi-family residence (duplex), served by a shared well and shared drainfield; access from existing approach to Frenchtown Frontage Road.
A public meeting will be held before the Board of County Commissioners, the final decision-making authority, on Thursday, May 22, at 2 p.m. in the Sophie Moiese Room in the Missoula County Courthouse. A summary of agency comments has been included in the Review Packet as required under Missoula County Subdivision Regulations Section 5.8.7.3.
Adjacent property owners and relevant neighborhood groups will be notified of the public meeting by certified mail in accordance with Missoula County Subdivision Regulations Section 5.8.10. Residents are encouraged to submit questions or comments regarding the proposed subdivision.
Comments can be submitted online or via mail: Missoula County Planning, Development & Sustainability, 200 W. Broadway, Missoula, MT 59802.
Project Timeline:
Feb. 19: 1st Element Review
April 4: 1st Sufficiency Review
March 14: 2nd Element Review
Thursday, May 22: Public Meeting
2 p.m. — Sophie Moiese Room — Missoula County Courthouse
Hybrid option available by joining the meeting via Microsoft Teams.
Project Lead:
Tim Worley, Senior Planner — PDS
Related Documents & Links:
2 comments
-
Miramonte Manley Lofts Subdivision
Share Miramonte Manley Lofts Subdivision on Facebook Share Miramonte Manley Lofts Subdivision on Twitter Share Miramonte Manley Lofts Subdivision on Linkedin Email Miramonte Manley Lofts Subdivision linkAt their June 26 public meeting, the commissioners approved this subdivision with conditions, including requiring privacy fencing/screening on the western edge of the subdivision.Project Description:
Miramonte Manley LLC represented by IMEG Corp, has submitted a request to the Missoula County Department of Planning, Development and Sustainability (PDS) to create a one-lot minor subdivision, legally described as Certificate of Survey #637 and Tract A2 of Certificate of Survey #1363 (NE4 S21, T14N, R20W).
The approximately 7-acre property at 9655 Highway 93 N. (at the Wye) is currently developed with a single household dwelling, which the subdivider proposes to demolish for the construction of a multi-household development. The subdivision is intended to meet requirements under MCA §76-3-203(1) to allow for the construction of ownership units (condominiums or townhomes) instead of rental apartments.
The public is invited to submit comment regarding the proposal no later than Friday, June 20. Decisions are based on the Review Criteria for Sub division Requests, comments relating to those criteria are most useful. Comments can be left on this page or mailed to PDS, 200 W. Broadway, Missoula, MT 59802, Attn: Tim Worley.
The decision date for this subdivision has been rescheduled. A public meeting before the Board of County Commissioners will be held at 2 p.m. Thursday, June 26, 2025, in the Sophie Moiese Room of the Missoula County Courthouse Annex, 200 W. Broadway, Missoula, or via Microsoft Teams. The Commissioners' public meetings are held in hybrid fashion, with options for people to participate either by attending in person or calling in via Microsoft Teams. For those wishing to attend in person, the meeting will be held in the Missoula County Courthouse Annex in the Sophie Moiese Room.
The proposed subdivision is available for public inspection at the Missoula County Planning, Development and Sustainability office, 127 E. Main, Suite 2, Missoula; and at the Missoula County Clerk and Recorder’s Office, 200 W. Broadway, Missoula. For additional information, you may contact the project lead, Tim Worley.
Project Timeline:
Public comment deadline: Friday, June 20
County Commissioners' decision: Thursday, June 26
Project Lead:
Tim Worley, Missoula County Department of Planning, Development, and Sustainability
Phone: 406-258-4794
Email: tworley@missoulacounty.us
Related Documents & Links:
-
Missoula County Floodplain Development Permit #25-07
Share Missoula County Floodplain Development Permit #25-07 on Facebook Share Missoula County Floodplain Development Permit #25-07 on Twitter Share Missoula County Floodplain Development Permit #25-07 on Linkedin Email Missoula County Floodplain Development Permit #25-07 linkThe permit was issued with conditions of approval.Project Description:
The Missoula County Planning, Development & Sustainability Department (PDS) has received a floodplain development permit application from the City of Missoula for excavation, grading and channel realignment in the Grant Creek regulated flood hazard area. The site is located on multiple parcels, described as Tract 1-A of COS 6916, and Tracts 2,3 and 4 of COS 6758 in Sections 1 and 6, Township 13 North, Range 20 West, Missoula County, P.M.M. Project maps are in the application packet. This is a portion of Grant Creek referred to as “Horseshoe Bend,” southeast of Whippoorwill Drive and southwest of West Broadway in the Sxwtpqyen Neighborhoods Planning Area.
The purpose of this floodplain development permit is to ensure the proposed excavation and channel work complies with the floodplain regulations, which are designed to promote public health, safety and general welfare while minimizing flood-related risks and losses in areas subject to flood hazards and promoting wise use of the floodplain.
The project aims to begin work on realignment of this section of Grant Creek, enhancing floodplain function, restoring channel sinuosity and promoting water quality. This specific permit is intended to allow the contractor to begin excavating the proposed floodplain and channel to ensure the project is completed prior to deadlines for available funding.
There are future processes that will need to be completed, such as a Conditional Letter of Map Amendment (CLOMR) from the Federal Emergency Management Agency (FEMA) that will include additional permit(s) and public participation.
The full application is available for review in the PDS office at 127 E. Main St., Suite 2, in Missoula or online here. Written comments will be accepted through Monday, May 5. Address comments to: Matt Heimel, Floodplain Administrator, Planning, Development & Sustainability, 200 W. Broadway, Missoula, MT 59802. Contact floodplain@missoulacounty.us or 406-258-4657 for more information.
The primary purpose of a floodplain development is to promote the public health, safety and general welfare, to minimize flood losses in areas subject to flood hazards, and to promote wise use of the floodplain.
Missoula County cannot approve a floodplain permit implementing a physical change to the floodplain prior to issuance of a CLOMR by FEMA. That document will be a FEMA letter of approval for a proposed physical change that when completed would propose to change the flood zones, delineation of elevations on the FEMA Flood Insurance Rate Map or FEMA Flood Boundary Map and may amend the FEMA Flood Insurance Study.
The project with this permit is designed to not implement the physical change or include a hydrological connection between the existing channel and proposed new channel. Additional reviews will be necessary as the Grant Creek restoration efforts continue.
Project Timeline:
Public Comment Period: Open through Monday, May 5. The public is invited and encouraged to provide comments and questions for the administrative permit review.
Permit Review Process: Once the application is deemed complete and correct, the floodplain administrator will review the project and determine whether to approve, approve with conditions or deny the permit within 180 days.
Staff Lead:
Matt Heimel
Related Documents & Links:
-
Missoula County Floodplain Development Permit #25-18
Share Missoula County Floodplain Development Permit #25-18 on Facebook Share Missoula County Floodplain Development Permit #25-18 on Twitter Share Missoula County Floodplain Development Permit #25-18 on Linkedin Email Missoula County Floodplain Development Permit #25-18 linkThe permit was issued with conditions of approval.Project Description:
The Missoula County Planning, Development & Sustainability Department (PDS) has received a floodplain development permit application from Missoula County Public Works for proposed improvements at the Lolo Wastewater Treatment Plant. The project site is located at 1755 Lake Side Drive, within the Lake View Utility Block COS in Section 12, Township 12 North, Range 20 West, Missoula County. This site falls within the Bitterroot River regulated flood hazard area.

The purpose of this floodplain development permit is to ensure the proposed improvements comply with floodplain regulations, which are designed to promote public health, safety and general welfare while minimizing flood-related risks and losses in areas subject to flood hazards and promoting wise use of the floodplain. The project aims to enhance the functionality and resilience of the Lolo Wastewater Treatment Plant while ensuring responsible development within the floodplain.
The full application is available for review at the PDS office (127 E. Main St., Suite 2, Missoula) or online here. Written comments on the application will be accepted through Friday, April 18. Comments can be submitted online below, mailed and addressed to Matt Heimel, floodplain administrator, at 200 W. Broadway, Missoula, MT 59802, or emailed to floodplain@missoulacounty.us. For additional information, call 406-258-4657.
This permit process is a standard administrative review but is being made available on Missoula County Voice to enhance public accessibility and transparency. Residents are encouraged to stay informed and participate in the process to support responsible floodplain management in Missoula County.
Project Timeline:
Public Comment Period: Open through Friday, April 18. Community members are encouraged to submit feedback on the project during this time.
Permit Review Process: Once the application is deemed complete and correct, the floodplain administrator will review the project and determine whether to approve, approve with conditions or deny the permit within 180 days.
Final Decision: The floodplain administrator is the designated decision-maker for this application. The final determination will be made within the review period, taking into account regulatory compliance and public input.
Staff Lead:
Matt Heimel
Related Documents & Links:
-
Missoula County Floodplain Development Permit #25-16
Share Missoula County Floodplain Development Permit #25-16 on Facebook Share Missoula County Floodplain Development Permit #25-16 on Twitter Share Missoula County Floodplain Development Permit #25-16 on Linkedin Email Missoula County Floodplain Development Permit #25-16 linkThe permit was issued with conditions of approval.Project Description:
The Missoula County Planning, Development & Sustainability Department (PDS) has received a floodplain development permit application from the Butler Creek Trail Association for the construction of a gravel walking path at 8255 Butler Creek Road. The project site is located in Tract 2 of COS 6921 within Section 26, Township 14 North, Range 20 West, Missoula County, in the Butler Creek flood hazard area.

The purpose of this floodplain development permit is to ensure the proposed walking path complies with floodplain regulations, which are designed to promote public health, safety and general welfare while minimizing flood-related risks and losses in areas subject to flood hazards and promoting wise use of the floodplain. The construction of the gravel walking path aims to enhance public access to the area while ensuring responsible development within the floodplain.
The full application is available for review at the PDS office (127 E. Main St., Suite 2, Missoula) or online here. Written comments on the application will be accepted through Friday, April 18. Comments can be submitted online below, mailed and addressed to Matt Heimel, floodplain administrator, at 200 W. Broadway, Missoula, MT 59802, or emailed to floodplain@missoulacounty.us. For additional information, call 406-258-4657.
This permit process is a standard administrative review but is being made available on Missoula County Voice to enhance public accessibility and transparency. Residents are encouraged to stay informed and participate in the process to support responsible floodplain management in Missoula County.
Project Timeline:
Public Comment Period: Open through Friday, April 18. Community members are encouraged to submit feedback on the project during this time.
Permit Review Process: Once the application is deemed complete and correct, the floodplain administrator will review the project and determine whether to approve, approve with conditions, or deny the permit within 180 days.
Final Decision: The floodplain administrator is the designated decision-maker for this application. The final determination will be made within the review period, taking into account regulatory compliance and public input.
Staff Lead:
Matt Heimel
Related Documents & Links:
-
Missoula County Floodplain Development Permit #25-02
Share Missoula County Floodplain Development Permit #25-02 on Facebook Share Missoula County Floodplain Development Permit #25-02 on Twitter Share Missoula County Floodplain Development Permit #25-02 on Linkedin Email Missoula County Floodplain Development Permit #25-02 linkThe permit was issued with conditions of approval.Project Description:

The Missoula County Planning, Development & Sustainability Department (PDS) has received a floodplain development permit application from Allen and Theodora McKee for buried vehicle removal and bank restoration at 4022 South 3rd St. W. The project site, located in Parcel 1 of COS 6214 within Section 24, Township 13 North, Range 20 West, Missoula County, falls within the Clark Fork River regulated flood hazard area.
The purpose of this floodplain development permit is to ensure the proposed activities comply with floodplain regulations, which are designed to promote public health, safety and general welfare while minimizing flood-related risks and losses in areas subject to flood hazards and promoting wise use of the floodplain. The project includes the removal of buried vehicles from the site and the restoration of the riverbank to reduce potential environmental hazards and improve floodplain stability.
Community members interested in reviewing the full application can do so at the PDS office (127 E. Main St., Suite 2, Missoula) or online here. Written comments on the application will be accepted through Friday, April 18. Comments can be submitted online below, mailed and addressed to Matt Heimel, floodplain administrator, at 200 W. Broadway, Missoula, MT 59802, or emailed to floodplain@missoulacounty.us. For additional information, call 406-258-4657.
This permit process is a standard administrative review but is being made available on Missoula County Voice to enhance public accessibility and transparency. Residents are encouraged to stay informed and participate in the process to help ensure responsible floodplain management in Missoula County.
Project Timeline:
Public Comment Period: Open through Friday, April 18. Community members are encouraged to submit their input during this time.
Permit Review Process: Once the application is deemed complete and correct, the floodplain administrator will review the project and determine whether to approve, approve with conditions or deny the permit within 180 days.
Final Decision: The floodplain administrator is the designated decision-maker for this application. The final determination will be made within the review period, taking into account regulatory compliance and public feedback.
Staff Lead:
Matt Heimel
Related Documents & Links:
-
West Trail Minor Subdivision
Share West Trail Minor Subdivision on Facebook Share West Trail Minor Subdivision on Twitter Share West Trail Minor Subdivision on Linkedin Email West Trail Minor Subdivision linkThe West Trail Administrative Minor Subdivision was approved.The Missoula County Department of Planning, Development and Sustainability (PDS) is reviewing a subdivision request submitted by Sun Pillar, LLC, represented by Missoula Engineering, LLC, to establish the West Trail Minor Subdivision in East Missoula. This proposal affects a 0.67-acre property already developed and legally described as Amended Plat of East Missoula Addition, Block 21, Lot 1A, S24, T13 N, R19 W.
The purpose of this request is to meet administrative requirements under MCA §76-3-203(1), allowing existing rental units to be converted into condos or townhomes. No new lots or dwelling units are being added as part of this subdivision.
Missoula County is notifying adjacent property owners and welcoming public comments on this proposal. If you would like to provide feedback, please submit your comments no later than Monday, April 14. Comments should relate to subdivision review criteria and can be submitted via:
Commenting below (Preferred)
Mail: PDS, 200 W. Broadway, Missoula, MT 59802, Attn: Jennie Dixon
As an Administrative Minor Subdivision, this decision falls under the authority of the subdivision administrator at PDS and is not subject to a public hearing with the Board of County Commissioners. Appeals to the decision must follow Missoula County Subdivision Regulations, Section 5.8.16.9. The statutory deadline for a final decision is Tuesday, April 15.
View the Review Criteria for Subdivision Requests here.
The proposed subdivision is available for public inspection at the Missoula County Planning, Development and Sustainability Office, 127 E. Main, Suite 2, Missoula, MT, and the Missoula County Clerk and Recorder’s Office, 200 W. Broadway, Missoula, MT.
Project Timeline:
Public Comment Deadline: Monday, April 14
Decision Deadline: Tuesday, April 15
Project Staff Lead:
Jennie Dixon
406-258-4946
jdixon@missoulacounty.us
Related Documents:
-
Frenchtown Storage — Buildings for Lease or Rent
Share Frenchtown Storage — Buildings for Lease or Rent on Facebook Share Frenchtown Storage — Buildings for Lease or Rent on Twitter Share Frenchtown Storage — Buildings for Lease or Rent on Linkedin Email Frenchtown Storage — Buildings for Lease or Rent linkThe proposal was approved by the commissioners on Thursday, May 1.On Thursday, May 1, the Missoula County Commissioners voted 2-1 to approve this proposal. This was a legal land-use decision. Montana’s “build and lease” law applies to developments that don’t require utility services like water or sewer. Since the property is also unzoned, the County does not have authority to prevent this type of use.
Residents adjacent to the property have 30 days to appeal the decision. Conditions of approval include fencing or landscaping, signage for the nearby public path and lighting compliance. The development cannot operate 24/7 and will use gravel driveways for large-vehicle access.
UPDATE: Public Hearing Postponed for Thursday, May 1. New BFLR Application available.
Project Description:
Request from developer Al Arneson, being represented by PCI, Inc., to construct eight storage buildings with varying unit sizes, some designed to accommodate RV and boat storage on the 5.05-acre parcel. The buildings run north to south to maximize the size of the property. A fence will be placed around the property for privacy screening and to prevent trespassing.
Project Summary
The Frenchtown Storage project proposes construction of eight self-storage buildings on a 5.05-acre parcel at 15601 Roman Creek Road, at the southwest corner of Roman Creek Road and Frenchtown Frontage Road. The developers claim this development is designed to meet the growing demand for storage in the Frenchtown area, particularly for RV and boat storage, as the region experiences commercial and industrial expansion. The developer plans to comply with dark skies lighting standards, perimeter landscaping along Roman Creek Road for aesthetics and the facility will not be open 24/7.
The site will feature:
• 71,230 square feet of storage space across multiple buildings.
• Pull-through units in Building 1 to accommodate large vehicles such as RVs and boats.
• Automated gated entry for secure self-access.
• Gravel driveways with ample space for maneuvering large vehicles.
• Security fencing and on-site lighting for safety and theft prevention.
Infrastructure and Environmental Considerations
• Stormwater management: Designed to handle a 100-year storm event, with detention areas on the east and west sides of the property and a culvert to manage water flow.
• Land Use and site impact: The property is currently vacant and requires grading, but no significant environmental impacts are anticipated. No wildlife habitats were identified on the site.
• Traffic and access: The property will use an existing curb cut on Roman Creek Road for entry, with an additional northern access point for redundancy. Driveways will be unpaved, and bollards will be installed for unit protection. A public pedestrian easement on the east property line will remain unaffected.
Project Timeline:
Public Input: The project team seeks comments and questions from adjacent property owners and the broader community.
Final Approval: The Board of County Commissioners at a public meeting scheduled for 2 p.m., Thursday, May 1, in the Sophie Moiese Room of the Missoula County Courthouse Annex, 200 West Broadway. The original meeting was scheduled for Thursday, April 10, but was postponed.
Engagement Methods: Comments or questions can be submitted on here on Missoula County Voice; or community members can provide input via by attending in person or may attend the meeting virtually over Microsoft Teams. To join the call on your phone, call 406-272-4824, Conference ID 467 457 758#. To join the meeting on your electronic device, please use the following link: missoula.co/bccmeetings
Project Staff Lead: Katy Reeder
Related Documents:
Frenchtown Storage Building for Lease or Rent Application (Updated)
Frenchtown Storage Warranty Deed
Other documents can be viewed on the right-hand side of this page under 'Documents' > 'Frenchtown Storage — Buildings for Lease or Rent.'
-
Placid View Lot Minor Subdivision
Share Placid View Lot Minor Subdivision on Facebook Share Placid View Lot Minor Subdivision on Twitter Share Placid View Lot Minor Subdivision on Linkedin Email Placid View Lot Minor Subdivision linkThe Board of County Commissioners voted to approve the request to remove an agricultural restriction at their public meeting on March 13.A request to vary from Missoula County Subdivision Regulations Section 3.3.2.4
Project Description:
Project Overview
Missoula County is considering a proposal to remove an agricultural restriction from a property near Placid Lake, allowing for residential development. This project, known as the Placid View Lot Minor Subdivision, also includes a request for a variance from the county's subdivision regulations regarding through lots. The Missoula County commissioners will review and make a decision on this request, with public input encouraged from nearby property owners.

What's being proposed?
Placid View is a one-lot minor subdivision near Placid Lake. The property is currently encumbered by a covenant that was placed on the property as part of a subdivision exemption in 2001. The covenant requires the property to be used exclusively for agricultural purposes. The applicants, David and Karen Castle, would like to remove the covenant so the property can be developed for a residential use.
Removing the covenant requires the property to go through local subdivision review and receive approval from the Missoula County commissioners. If approved, the agricultural restrictive covenant will be removed from the property, allowing for uses other than agriculture. No additional lots will be created through this subdivision request—this proposal is simply about making the land eligible for home construction while still following all relevant zoning, health and building regulations. Any future development will still be required to comply with those regulations.
The Castles are also applying for a variance from Section 3.3.2.4 of the Missoula County Subdivision Regulations to allow the proposed subdivision lot to vary from through-lot restrictions. Their property is currently bordered by two existing roads—North Placid Lake Road (to the south) and Placid Creek Road (to the north). This is considered a "through lot" (lots with roads on both sides) in the Missoula County Subdivision Regulations, which are prohibited except when they are essential to overcome specific disadvantages of topography or orientation, as determined by the county commissioners as a variance request.
Project Timeline:
Missoula County wants to hear from adjacent property owners before making a decision. If you have questions or concerns about this proposal, now is the time to voice them.
- Submit Comments: Residents can share their thoughts and questions by commenting on this post or contacting the project lead between now and the public hearing.
-
Attend the Public Hearing: The Missoula County commissioners will discuss and vote on this proposal 2 p.m. Thursday, March 13, in the Sophie Moiese Room of the Missoula County Courthouse Annex, 200 West Broadway.
Participants may attend in person at this location or may attend the meeting virtually over Microsoft Teams. To join the call on your phone, call 406-272-4824, Conference ID 467 457 758#. To join the meeting on your electronic device, please use the following link: missoula.co/bccmeetings
Project Staff Lead: Patrick Swart
Follow Project
Who's Listening
-
Phone 406-258-4794 -
Planner III/Floodplain Administrator
Missoula County Planning, Development and Sustainability
Phone 406-258-3799 -
Phone 406-258-4946 -
Phone 406-258-3425 -
Phone 406-258-3706 Email lryan@missoulacounty.us -
Phone 406-258-4841 -
Phone 406-258-4652 -
Phone 406-258-3707
Important Documents
-
Blackfoot Crossing Project
-
01_Growth Policy Amendment Request2.0.pdf (739 KB) (pdf)
-
02_Zoning Amendment Application.pdf (317 KB) (pdf)
-
03_Existing Land Use.pdf (518 KB) (pdf)
-
04_Proposed Land Use.pdf (532 KB) (pdf)
-
05_Working Lands Land Use.pdf (383 KB) (pdf)
-
06_Open Resource and Recreation Land Use.pdf (383 KB) (pdf)
-
07_Neighborhood Center Land Use.pdf (368 KB) (pdf)
-
08_Commercial Center Land Use.pdf (350 KB) (pdf)
-
09_Industrial Center Land Use.pdf (353 KB) (pdf)
-
10_Heavy Industrial Center Land Use.pdf (361 KB) (pdf)
-
11_Existing Zoning.pdf (550 KB) (pdf)
-
12_Proposed Zoning.pdf (551 KB) (pdf)
-
13_Zoning Uses.pdf (190 KB) (pdf)
-
14_Aerial Topo.pdf (1.35 MB) (pdf)
-
15_Existing Conditions.pdf (907 KB) (pdf)
-
16_01 Legal Constraints.pdf (684 KB) (pdf)
-
17_WUI.pdf (186 KB) (pdf)
-
18_Slopes.pdf (5.65 MB) (pdf)
-
19_High Pressure Gas Lines.pdf (456 KB) (pdf)
-
20_utilities.pdf (581 KB) (pdf)
-
21_Earthquake Faults.pdf (2.12 MB) (pdf)
-
22_avalanche slope.pdf (1.15 MB) (pdf)
-
23_Hazardous Waste.pdf (435 KB) (pdf)
-
24_Healthcare Facilities.pdf (695 KB) (pdf)
-
25_Dam Failure.pdf (343 KB) (pdf)
-
26_Vegetation.pdf (1.51 MB) (pdf)
-
27_Flooplain.pdf (1.3 MB) (pdf)
-
28_Hydrology.pdf (740 KB) (pdf)
-
29_Wildlife Distribution.pdf (1.77 MB) (pdf)
-
30_Transportation.pdf (1.92 MB) (pdf)
-
31_Cultural Resource Inventory.pdf (6.87 MB) (pdf)
-
32_Soils Report.pdf (1.26 MB) (pdf)
-
33_Blackfoot Crossing 1 Subdivision.pdf (4.17 MB) (pdf)
-
34_Blackfoot Crossing 1 Sub Phasing Plan.pdf (345 KB) (pdf)
-
35_Blackfoot Riverfront Pplat.pdf (2.39 MB) (pdf)
-
36_ Riverfront Phasing.pdf (359 KB) (pdf)
-
37_Preliminary Stormwater Report.pdf (8 MB) (pdf)
-
38_Test Pits.pdf (159 KB) (pdf)
-
39_Well Logs.pdf (1.39 MB) (pdf)
-
40_02_Neighborhood Meeting Letter_Mtg 1.pdf (111 KB) (pdf)
-
40_04_PowerPoint Presentation_Mtg 1.pdf (9.6 MB) (pdf)
-
40_06_Neighborhood Meeting Summary_Mtg 1.pdf (130 KB) (pdf)
-
40_07_Neighborhood Comment_Mtg 1.pdf (715 KB) (pdf)
-
41_02_Neighborhood Meeting Letter_Mtg 2.pdf (118 KB) (pdf)
-
41_04_PowerPoint Presentation_Mtg 2.pdf (4.79 MB) (pdf)
-
41_05_Neighborhood Meeting Summary_Mtg 2.pdf (1000 KB) (pdf)
-
42_01_September 9 2025 Community Council Agenda.pdf (665 KB) (pdf)
-
42_02 Community Council Meeting Summary.pdf (39.4 KB) (pdf)
-
42_03_ Community Council Meeting Transcript.pdf (217 KB) (pdf)
-
42_04_Community Council Meeting Presentation.pdf (4.66 MB) (pdf)
-
42_05_Community Council Draft Meeting Minutes.pdf (706 KB) (pdf)
-
43_2009 Community Visioning Map.pdf (475 KB) (pdf)
-
44_2009 BMCC Meeting record (NEW 10.25).pdf (468 KB) (pdf)
-
45_Traffic Impact Study.pdf (22.4 MB) (pdf)
-
46_Tech Memo West Riverside Access Impacts.pdf (1.05 MB) (pdf)
-
BFXR Sub Rpt_FINAL.pdf (1.72 MB) (pdf)
-
Approved rezone.pdf (549 KB) (pdf)
-
Approved growth policy designation.pdf (532 KB) (pdf)
-
-
Brown Family Transfer
-
0 Cover Letter.pdf (50.8 KB) (pdf)
-
1 2023 Family Transfer Exemption Application and Affidavit.2023.Fillable.Form.pdf (1.17 MB) (pdf)
-
1.2 Signed Family Transfer Division of Land Affidavit.pdf (1.32 MB) (pdf)
-
1.5 Signed Landowner Letter.pdf (497 KB) (pdf)
-
1.7 WarrantyDeed.pdf (35.2 KB) (pdf)
-
2 Dinsmore IOrchard Homes 4 Lots 29 30bk17pg54.pdf (172 KB) (pdf)
-
4 Maps.docx (3.82 MB) (docx)
-
4.1 ZD-13 Franklin to Fort.pdf (1010 KB) (pdf)
-
4.2 ZD-13 resolution 2007-088.pdf (155 KB) (pdf)
-
4.3 FIRMETTE_f340b8a5-3b5a-4f36-91b2-7f1b330784f0.pdf (734 KB) (pdf)
-
5 Ditch Cards 3114 3110.pdf (434 KB) (pdf)
-
6 Septic Permit 2016-247.pdf (6.45 MB) (pdf)
-
7 3816 Brown-EXISTING.pdf (161 KB) (pdf)
-
7 3816 Brown-PROPOSED.pdf (170 KB) (pdf)
-
2026-01-20 Brown FT 400.pdf (447 KB) (pdf)
-
-
Grass Valley Farms
-
Review Criteria for Subdivision Requests (182 KB) (PNG)
-
Lolo Ranch Exemption Application (899 KB) (pdf)
-
Lolo Ranch Tract Information (56.5 KB) (pdf)
-
Lolo Ranch Existing and Proposed Parcels (684 KB) (pdf)
-
Spanish Skies Variance Request Application (7.45 MB) (pdf)
-
Frenchtown Storage — Buildings for Lease or Rent
-
Blackfoot Crossing Subdivision Phasing Plan Amendment and Plat Adjustment Application (13.2 MB) (pdf)
-
Floodplain Development Permit #25-12
-
Floodplain Development Permit #25-07
-
Floodplain Development Permit #25-15
-
Floodplain Development Permit #25-22
-
2025-05-12.SpecialExceptionVariance Application.pdf (29.9 MB) (pdf)
-
Lazy Acres Preliminary Plat Extension Request.pdf (314 KB) (pdf)
-
Floodplain Development #26-07
-
Floodplain Development #26-01
-
Floodplain Development #26-03
-
Floodplain Development #26-04
-
Floodplain Development #26-06
-
McAlister Family Transfer and Aggregation Exemption
-
Hertz Family Transfer Application
-
Floodplain Development #26-02
-
Floodplain Development 26-09.pdf (16.5 MB) (pdf)
-
Big Bear Addition Subdivision Amendment Proposal.pdf (1.51 MB) (pdf)
-
505 Highton Complete Application.pdf (2.43 MB) (pdf)
-
Schuff Family Transfer Application.pdf (6.81 MB) (pdf)
-
Stephenson Family Transfer Application
-
3614 Hwy 200 Special Exception Application
-
3507 S 7th St. W Special Exception
-
Floodplain Development #26-10
-
Ployhar Family Transfer.pdf (2.38 MB) (pdf)
-
Gilman Creek Road
-
Blackfoot Crossing Riverfront Public Notice.pdf (54.2 KB) (pdf)
-
Ram Addition- Minor Adjustment Application.pdf (4.06 MB) (pdf)
-
Hoyer Family Transfer Application.pdf (5.7 MB) (pdf)
-
Nordberg Family Transfer.pdf (5.41 MB) (pdf)
-
O'Keefe Ranch Estates Subdivision Landscaping Condition Amendment
-
Crawford Family Transfer Exemption Application.pdf (4.85 MB) (pdf)
-
Crawford Family Transfer Existing and Proposed Conditions.pdf (1.5 MB) (pdf)
-
Special Exception at 1815 Clements Rd. (Target Range)
-
2026-01-22 Granite Peak Phasing Ext App.pdf (1.49 MB) (pdf)
-
Ranch Club Subdivision Phasing Plan Extension
-
Larch Meadows Minor Subdivision
-
2026-03-06 Full Application.Missoula County.Larch Meadows (1).pdf (74.5 MB) (pdf)
-
Section A.pdf (836 KB) (pdf)
-
Section B.pdf (892 KB) (pdf)
-
Section C.pdf (1.51 MB) (pdf)
-
Section D.pdf (1.92 MB) (pdf)
-
Section E.pdf (22.7 MB) (pdf)
-
Section F.pdf (29.7 MB) (pdf)
-
Section G.pdf (15.5 MB) (pdf)
-
Section H.pdf (1.56 MB) (pdf)
-
Section I.pdf (1.91 MB) (pdf)
-
-
7985 Hwy. 200 E
-
County 310 Permit No. 26-01
-
Floodplain Development #26-05
-
Floodplain Development #26-08
-
Floodplain Development #26-12
-
Fire Bucket Meadows
-
Fire Bucket Meadows Application (73 MB) (pdf)
-
Fire Bucket Meadows Final Combined Groundwater Report (25.2 MB) (pdf)
-
Applicant Letter to COmmissioners 5-28-25.pdf (19 MB) (pdf)
-
Fire Bucket Loop Aquifer Test Work Plan.pdf (105 KB) (pdf)
-
Fire Bucket Meadows Subdivision Application.pdf (73 MB) (pdf)
-
Geosyntec Hydrologic Technical Analysis and Pump Test Results 1-22-26.pdf (7.88 MB) (pdf)
-
Photos of area homes (1).pdf (18.9 MB) (pdf)
-
Attachment D - Newman Hydrogeologist Report 5-22-26.pdf (153 KB) (pdf)
-
Pump Test Notice to Neighbors 10-13-25.pdf (315 KB) (pdf)
-
Sparks Well Log 9-17-25.pdf (830 KB) (pdf)
-
Water Quality Reports 11-25.pdf (1.19 MB) (pdf)
-
Water Rights Inc Letter 5-13.pdf (534 KB) (pdf)
-
Water Rights Inc. Review of Hydrogeologic Literature 5-5-25.pdf (25.2 MB) (pdf)
-
Willowstick Groundwater Well Siting Study 6-30-25.pdf (2.55 MB) (pdf)
-
Fire Bucket Meadows Form 633_2026.03.09.xlsx (738 KB) (xlsx)
-
Fire Bucket Layout 3-9-26.pdf (1000 KB) (pdf)
-
Water Quality District Comments 5-29-25.pdf (260 KB) (pdf)
-
Attachment O - Water Quality District Comments 5-12-25.pdf (205 KB) (pdf)
-
Attachment P - Water Quality District Comments 5-29-25.pdf (260 KB) (pdf)
-
Attachment Q - Water Quality District Presentation 5-29-25.pdf (31.2 MB) (pdf)
-
Attachment R - MPH Comments 5-22-25.pdf (3.91 MB) (pdf)
-
Attachment S - Amended Fire Bucket Prelim Plat 3-11-26.pdf (3.46 MB) (pdf)
-
Attachment T - Amended Fire Bucket Layout 3-11-26.pdf (930 KB) (pdf)
-
Attachment U - Final Amended Grading and Drainage Report 3-16-26.pdf (3.05 MB) (pdf)
-
Attachment V - Final Amended Preliminary Plat and Lot Layout 3-16-26.pdf (2.15 MB) (pdf)
-
News Categories
- Administrative Minor Subdivision (1)
- Amendments (3)
- Boundary Line Relocation (2)
- Buildings for Lease or Rent (1)
- Floodplain Permits (6)
- Industrial Subdivision (2)
- Major Subdivision (5)
- Minor Subdivision (26)
- Mullan Road (1)
- Phasing Plan Extension (1)
- Ranch Club Subdivision (1)
- Special Exception Applications (10)
- Special Exemption Applications (1)
- Use Variance Requests (16)
- Zoning and Rezoning (4)
2 comments
